- Asia Pacific Rentals & Services
- 27/11/2026
Centurion Water to Trial Containerised Sludge Dredging and Dewatering Plant at Beverley Wastewater Treatment Plant
Centurion Water has been awarded a project with WA's principal water utility to trial a new containerised sludge dredging and dewatering plant at the Beverley Wastewater Treatment Plant, designed to clean wastewater lagoons without heavy site infrastructure.
Sludge builds up in wastewater lagoons over time and eventually has to be removed. Centurion Water's newly built plant handles the whole job in one unit:
- A remotely operated pontoon dredge lifts the sludge out
- A screw press separates the water
- The separated water returns to the lagoon
- The leftover solids are taken away for further treatment, with potential reuse in agriculture
The plant is self-contained, with its own tanks, pumps and generator. That makes it quick to set up and means it needs minimal site infrastructure.
Site works at Beverley start in December 2026 and are expected to take about a month.
Self-contained. Quick to set up. Minimal site infrastructure.
For more on our water and wastewater capabilities, visit our Water & Wastewater Solutions page.
Back to News