• Asia Pacific Rentals & Services
  • 27/11/2026

Centurion Water & Wastewater Solutions Awarded 2MLD Water Treatment Plant Upgrade at Boddington Mine

Centurion Water & Wastewater Solutions has been awarded the contract to design, manufacture and supply a 2MLD Water Treatment Plant upgrade at a mine in Boddington, Western Australia, for one of the world's leading gold companies. It is the second project Centurion has delivered for the client.


The upgrade adds 2MLD of treatment capacity so the site meets the Australian Drinking Water Guidelines and keeps up with process plant demand. It also improves the existing Reverse Osmosis (RO) system by removing iron and manganese from the feed water.

The scope includes:

  • DMI-65 filtration to remove iron and manganese
  • Ultrafiltration to control fouling
  • A low-pressure brackish water RO train
  • Full automation and remote monitoring, built to the client's specifications
  • Containerised and skidded equipment for quick installation on site

Practical completion is expected in mid 2027.

The first project for the client was a different scope: a truck washdown wastewater treatment plant for the same site. The plant is fully automated and SDAF-based, and built to handle water carrying heavy solids, oil and grease.

For more on our water treatment capabilities, visit our Water & Wastewater Solutions page.


Back to News